Back in March I posted about our plans to do some room shifting to move Tim to his own room. He'll be getting the guest room that Mr. B uses as his office. We're slowly doing things, one at a time, to make that happen. First, we're getting the master bedroom ready to hold stuff for three people (Miss M is in our room) that currently takes up two rooms.
The first step was this nifty closet above our bedroom door in the hallway to make room for stuff. It has a hinged door to hide the clutter, and it's about 4 feet suare and a foot high, so a lot of stuff will fit into it. Right now it's holding sewing/craft stuff.
Then we replaced the toilet and sink in the master bath. The pedestal sink makes the tiny room look bigger, and, as it turns out, it was the cheapest one in Home Depot. Baseboards will be a project for another day.
And the wall of cabinets is sitting in the basement, ready for assembly:
Friday, July 13, 2007
Remodel in progress
Posted by
LNL
at
7/13/2007 11:07:00 PM
Categories: Remodel
Subscribe to:
Comment Feed (RSS)




|